Compressed Air Audit Checklist

Use this checklist to prepare for a compressed air assessment, whether you run it in-house or with Nexus Turnkey. It follows the supply, distribution and demand structure used by ISO 11011.

Before the audit: documents

  • Single-line diagram and compressor-room layout
  • List of compressors: make, model, kW, control type, age and hours
  • Dryers, filters and receivers with ratings
  • 12 months of electricity bills and the tariff structure
  • Production schedule, including nights, weekends and holidays
  • Known problems: low pressure, moisture, trips, noise, heat

Supply side

  • Log kW (or amps and volts) on every compressor for at least a typical week
  • Log discharge and header pressure
  • Record load/unload behaviour and set points
  • Check room temperature and ventilation at peak
  • Check intake filters, coolers and condensate drains

Treatment and distribution

  • Measure pressure drop across dryers and filters
  • Measure pressure at the furthest and most critical users
  • Check pressure dew point against the required ISO 8573-1 class
  • Walk the ring main: dead ends, undersized drops, missing drains
  • Ultrasonic leak survey with tagging and size estimates

Demand side

  • List the users that set the required pressure
  • Identify inappropriate uses (open blowing, cabinet cooling, sparging)
  • Measure off-production demand (the 'leak load')
  • Note planned changes and expansions

After the audit

  • Baseline: kWh, delivered volume and specific energy (kWh/m³)
  • Ranked actions with investment, assumptions and payback
  • A measurement and verification plan for each action
  • Responsibilities and dates
Nexus Turnkey · +855 14 706 062 · nexusengimpexp@gmail.comGeneral guidance. Apply with qualified engineering judgement.