Phnom Penh, serving Cambodia and the region

Service

Measure first. Then decide what is worth fixing.

A compressed air audit measures how your system actually performs: power, pressure, flow, dew point, compressor loading and leakage, across a representative production period. Nexus Turnkey follows a four-step method, Measure, Prioritise, Implement, Verify, and delivers a baseline report, a ranked action list with investment and payback assumptions, and a verification plan. Savings are verified as the normalised kWh reduction multiplied by the tariff we agree with you. We don't promise a blanket percentage.

Pressure gauge on a stainless steel process line

Why audit before you spend

Most compressed air decisions are made without data. A compressor is replaced because it is old. A larger one is bought because pressure is low. A dryer is added because water appeared after rain. Some of these decisions are right. Many treat a symptom and leave the cause in place.

An air audit replaces opinion with measurement. It shows what your system consumes, what it delivers, where the losses are and which fixes are worth paying for. It also gives you a baseline, which is the only fair way to prove later that a change saved anything at all.

What we measure

We measure the system across a representative production period, not a snapshot. The exact set depends on the site, but a typical audit covers the following.

Typical audit measurements

  • Electrical power of each compressor, logged continuously
  • Loaded, unloaded and stopped time for each machine
  • Pressure at the compressor discharge, after treatment and at key points of use
  • Delivered flow, from existing meters or temporary measurement
  • Pressure dew point after the dryers
  • Pressure drop across dryers and filters
  • Compressor room temperature and ventilation
  • Leaks, located and tagged by ultrasonic survey
  • Demand when production is stopped
  • How air is used: open blowing, cooling and other inappropriate or artificial demand

From these we calculate specific energy in kWh/m³, the efficiency figure for the whole hall, along with the unloaded power cost, the pressure profile and the leak rate.

Our method: Measure, Prioritise, Implement, Verify

1. Measure. We install loggers and instruments, run the leak survey, and collect production data so consumption can be normalised. We also inventory every compressor, dryer, filter, receiver and drain, and note its condition.

2. Prioritise. We analyse the data and build a list of actions. Each one is ranked by expected energy saving, investment, payback and practicality. Some are free, such as changing a setpoint or a compressor’s role. Some need modest spend, such as leak repair and zero-loss drains. Some need capital, such as a VSD trim compressor or re-piping.

3. Implement. You decide what to do. We can carry out the work, or your team can. If we do it, design and engineering and installation follow the same documented process as any other project.

4. Verify. After implementation, we measure again, under comparable conditions, using the plan agreed before the work began.

A saving you cannot measure is a promise. A saving you have measured is a result.

What you receive

The sample deliverable on this page shows the format. Every audit produces four documents.

  • Baseline report. How the system performs today: consumption, specific energy, load profiles, pressure profile, dew point, leakage and the condition of each item of equipment.
  • Ranked action list. Each recommended action with its expected saving, the work involved and its priority.
  • Investment and payback assumptions. The cost basis, tariff, operating hours and other assumptions behind each payback figure, set out so your finance team can check them.
  • Verification plan. What will be measured after implementation, for how long, how results will be normalised for production, and how the saving will be calculated.

How savings are calculated

We calculate savings one way, and we agree the inputs before any work starts.

Savings are project-specific. We measure them against a baseline and verify them after implementation; we don’t promise a blanket percentage.

ISO 11011: the system view

Who an audit is for

An audit is worth doing when the electricity bill is rising, when pressure or moisture problems keep returning, before you buy a new compressor, or before a renovation. It is the first step of our energy optimisation and plant renovation work, and often the reason a plant adds AirSight monitoring afterwards.

Want a quick estimate first? Try the compressed air cost calculator or the leak cost calculator. For background, read what a compressed air audit involves.

Engineering deliverables

What you receive, before you commit

Every stage ends in a document you can check, approve and keep. These sheets are generic samples of the format.

  • Sample
    AUD-01Rev ANexus Turnkey
    Air audit reportBaseline, demand profile, ranked actions with investment and payback assumptions, verification plan.
  • Sample
    PID-02Rev ANexus Turnkey
    P&ID excerptGeneration, treatment and storage with instrument tags, isolation and condensate routes.
  • Sample
    ISO-03Rev ANexus Turnkey
    Piping isometricRing main and drops with sizes, slopes, drain points and isolation valves.
  • Sample
    COM-04Rev ANexus Turnkey
    Commissioning checklistPre-start, functional and performance checks, signed line by line.
  • Sample
    SAT-05Rev ANexus Turnkey
    SAT certificateSite acceptance against agreed criteria, punch list and sign-off.

FAQ

Questions engineers ask us

How long does a compressed air audit take?

The measurement period has to represent how your plant really runs, including normal production and, ideally, a period when production is stopped so leakage can be seen on its own. We agree the period with you when we scope the audit, based on your shift pattern and production cycle.

Do you need to stop production to install the loggers?

Usually not. Power loggers and pressure transmitters are normally fitted without stopping the plant. Some flow measurements need a short isolation, which we schedule with your team in advance.

What will the audit tell us that our compressor controller does not?

A controller reports on one machine. The audit looks at the whole system: how the compressors share the load, what the hall's specific energy is, where pressure is lost between the compressor room and the machines, how much air leaks, and what the dryers and filters cost you. That is where most savings are found.

How much will we save?

Savings are project-specific. We measure them against a baseline and verify them after implementation; we don't promise a blanket percentage. The audit report gives you the expected saving for each action, with the assumptions shown, so you can judge it yourself.

Is the audit only useful if we buy new equipment?

No. Many of the highest-ranked actions need little or no capital: fixing leaks, lowering pressure after removing restrictions, changing compressor roles and isolating idle zones. The report is yours to act on, with us or without us.

Do you follow ISO 11011?

Our method follows the structure ISO 11011 describes: assessing supply, distribution and demand as one system, with defined measurements and reporting. We describe the standard to explain the method; we do not claim certification against it.

What is the difference between an air audit and a leak survey?

A leak survey finds and tags leaks. An air audit measures the whole system, including compressor performance, pressure profile, treatment and demand. Leak detection is usually part of an audit, and is also available on its own.

Next step

Book an air audit

Tell us about your compressors, your shifts and your electricity bill. We will scope a measurement plan for your plant.

Start typing to search