Installed to the drawings, tested before handover, documented after

Compressor installation in Cambodia with Nexus Turnkey covers the full path from delivery to acceptance: mechanical, piping, electrical and instrumentation work to the approved drawings, inspection records at each stage, factory and site acceptance tests, staged start-up, performance and air-quality checks, operator training and a documented handover. One team installs, integrates and commissions the system, so one team answers for whether it performs as designed.

Fitter in a hard hat grinding a large steel pipe section

Where good designs go wrong

A well-engineered system can still disappoint if it is installed carelessly. Piping laid without falls traps water. Drops taken from the bottom of the main carry condensate to machines. A pressure test skipped to save a day becomes a leak that runs for years. A compressor started without checks trips in its first week and loses the owner’s confidence.

Installation and commissioning is where the design becomes real, and where the owner should get proof that it works.

Installation to the approved drawings

We install against the drawings you approved during design and engineering. The work covers:

  • Mechanical: setting equipment on prepared foundations, alignment, anti-vibration measures and access for maintenance;
  • Piping: ring mains, headers and drops with correct falls, drain points, isolation and supports, followed by pressure testing;
  • Electrical: power supply, protection, cabling, panels and metering to the single-line diagram;
  • Instrumentation: pressure, flow, dew-point and temperature instruments, and any air quality sensors;
  • Ventilation and room works: ducting for hot air, intake openings and condensate drainage.

Each stage produces inspection records: material checks, installation checks against the drawings, pressure-test results and electrical test results. These go into the handover pack.

In a running factory, each tie-in follows a written method agreed with your production team: isolation, temporary supply where needed, the sequence of work, testing and restart.

Safe work on your site

Installation work happens in your plant, often beside running production. We agree site rules with you before mobilising: permits to work, isolation and lock-out of electrical and pressurised systems, lifting plans for heavy equipment, controls on hot work, and housekeeping in shared areas. Compressed air systems store energy, so no pipe or vessel is opened until it has been isolated and depressurised, and the isolation has been checked.

Your production team knows where we are working, when, and what will be isolated. Surprises are planned out before work starts.

Testing: FAT and SAT

Commissioning, step by step

Commissioning is not “switch it on and see”. It is a defined sequence, with records at each step.

  1. Pre-start checks. Rotation, oil levels, electrical protection settings, instrument calibration, drain operation, isolation positions.
  2. Integration. Controllers, the sequencer, PLC and SCADA connected; meters, dew-point and flow instruments, alarms and historian configured.
  3. Logic and alarm tests. Each control function and alarm tested against the control philosophy, including fault and power-loss behaviour.
  4. Staged start-up. Machines brought online one at a time, then together, with sequencing tested across the demand range.
  5. Performance checks. Pressure at the points of use, flow, power and stability measured against the design.
  6. Air-quality verification. Pressure dew point and, where specified, other parameters checked at the agreed points against the target ISO 8573-1 class.
  7. Punch list. Outstanding items recorded, assigned and closed.
  8. Final acceptance. SAT signed off once the criteria are met.

Commissioning ends with evidence, not with a handshake.

Training

People who run the system need to understand it. We train operators on normal operation, daily and weekly checks, alarms and what to do about them, and safe isolation. Engineers and maintenance staff receive a deeper session on settings, the control logic and maintenance tasks. Training is carried out on your installed system, not in the abstract.

The handover pack

What you receive at handover

  • As-built drawings: P&IDs, isometrics, GA and electrical
  • Equipment manuals and datasheets
  • Inspection, pressure-test and electrical test records
  • Commissioning and SAT records
  • Documented set-points for every compressor, dryer and the sequencer
  • Recommended spares list
  • Maintenance schedule
  • Training attendance record

The handover pack is the record of what you own. It means your team, or anyone you appoint later, can maintain and extend the system without reverse-engineering it.

After handover

Handover is the start of the system’s working life, not the end of our involvement. Warranty support runs through one contact. A maintenance contract keeps performance on track, spare parts are supplied through authorised channels, and a follow-up visit checks the system once it has settled into production.

This service covers every system we deliver: compressed air, nitrogen generators, dehumidifiers, HVAC and chillers, blowers and air quality and emissions equipment. It is stages four to six of how we work.

Engineering deliverables

What you receive, before you commit

Every stage ends in a document you can check, approve and keep. These sheets are generic samples of the format.

  • Sample
    COM-04Rev ANexus Turnkey
    Commissioning checklistPre-start, functional and performance checks, signed line by line.
  • Sample
    SAT-05Rev ANexus Turnkey
    SAT certificateSite acceptance against agreed criteria, punch list and sign-off.
  • Sample
    ISO-03Rev ANexus Turnkey
    Piping isometricRing main and drops with sizes, slopes, drain points and isolation valves.
  • Sample
    PID-02Rev ANexus Turnkey
    P&ID excerptGeneration, treatment and storage with instrument tags, isolation and condensate routes.
  • Sample
    AUD-01Rev ANexus Turnkey
    Air audit reportBaseline, demand profile, ranked actions with investment and payback assumptions, verification plan.

FAQ

Questions engineers ask us

What is the difference between FAT and SAT?

A factory acceptance test (FAT) checks equipment or a control panel before it leaves the supplier, so problems are found before shipping. A site acceptance test (SAT) checks the installed system on your site against the agreed criteria. FAT is used where the equipment and project justify it; SAT is part of every commissioning.

Can you install in a running factory?

Yes. Installation in a live plant is planned around production: tie-ins during weekends or planned shutdowns, temporary air where needed, and a written method for each changeover agreed with your team.

What does commissioning include?

Pre-start checks, staged start-up, logic and alarm tests, sequencing tests, performance checks against the design and air-quality verification at the agreed points. Commissioning ends with a punch list and its close-out, then final acceptance.

Do you train our operators?

Yes. Training covers normal operation, daily and weekly checks, alarms and what to do about them, and safe isolation. Engineers and maintenance staff get a deeper session on settings, logic and maintenance tasks.

What documents do we receive at handover?

As-built drawings, equipment manuals, test and commissioning records, documented set-points, a recommended spares list and a maintenance schedule. The handover pack is the record of what you own.

Do you install equipment you did not supply?

Talk to us. We prefer to supply and install so one team is accountable for the result, but we can integrate existing equipment and, in some cases, install equipment you have already bought.

Next step

Plan your installation

Tell us what is being installed, where, and when production can allow it. We will propose a method and programme.

Start typing to search